By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Gulf PressGulf Press
  • Gulf News
    • Saudi Arabia
    • UAE
    • Oman
    • Kuwait
    • Qatar
    • Bahrain
  • Business
  • Technology
  • Real Estate
  • Sport
  • Travel
  • Lifestyle
  • Rankings
  • Explained
  • Opinion
Search
Countries
More Topics
Site Links
  • Newsletter
  • Terms
  • About Us
  • Advertise with us
  • Contact Us
© 2023 Gulf Press. All Rights Reserved.
Reading: Boeing will take weeks to restart plane production following strike
Share
Notification Show More
Latest News
Taif Governor Inspects Historic District, Vows Heritage Preservation
Saudi Arabia
National Committee Reviews Government Policy for Sustainable Endowments and Zakat Funds Wednesday
UAE
Are Rising Living Costs Changing Life in Gulf Countries?
Are Rising Living Costs Changing Life in Gulf Countries?
Opinion
Saudi Arabia National Team Fixtures 2026 Match Schedule Results and FIFA World Cup Preparation
Saudi Arabia National Team Fixtures 2026 Match Schedule Results and FIFA World Cup Preparation
Sport
Families Swap Late Nights for Discipline Ahead of School Reopening
Saudi Arabia
Aa
Gulf PressGulf Press
Aa
  • Gulf News
  • Business
  • Technology
  • Real Estate
  • Sport
  • Travel
  • Lifestyle
  • Rankings
  • Explained
  • Opinion
Search
  • Gulf News
    • Saudi Arabia
    • UAE
    • Oman
    • Kuwait
    • Qatar
    • Bahrain
  • Business
  • Technology
  • Real Estate
  • Sport
  • Travel
  • Lifestyle
  • Rankings
  • Explained
  • Opinion
Have an existing account? Sign In
Follow US
  • Terms
  • About Us
  • Advertise with us
  • Contact Us
© 2023 Gulf Press. All Rights Reserved.
Gulf Press > Gulf News > Boeing will take weeks to restart plane production following strike
Gulf News

Boeing will take weeks to restart plane production following strike

News Room
Last updated: 2024/11/13 at 8:48 AM
News Room
Share
4 Min Read
SHARE

Boeing’s delays in delivering new passenger planes have caused frustration among airline customers, even before the strike started on September 13th involving 33,000 machinists. The return of factory workers after the strike lasted nearly two months has led to further delays in production. Boeing mentioned that it will take several weeks before they can fully resume building passenger planes due to the necessary steps needed to resume production at plants in Washington state and Oregon. This delay has also affected the schedule for gaining certification of new 737 Max models.

Irish airline Ryanair is still expecting to receive its first 737 Max 10s in the first half of 2027. However, American Airlines CEO Robert Isom has refrained from predicting when his airline might see the largest version of the Max, as it has not yet been certified by US regulators. Isom highlighted the importance of prioritizing quality over speed in production, emphasizing the need to get one quality aircraft off the line first. He mentioned this during an airline conference in Dallas, reiterating that once Boeing can achieve this, they can then work on increasing the production of the Max to meet airline delivery schedules.

Boeing workers who are represented by the International Association of Machinists and Aerospace were required to return to work by Tuesday after they voted last week to accept a Boeing contract offer. This contract offer will increase pay rates by 38% over four years but will not restore pensions that were frozen a decade ago. The strike has resulted in the shutdown of production of the 737 Max and 777 passenger planes, as well as a cargo-carrying version of the 767 plane. However, Boeing was able to continue building 787s, produced by non-union workers in South Carolina. This strike has significantly impacted the cash flow that Boeing typically receives upon delivering new planes.

Despite the challenges, Boeing managed to deliver 14 planes in October, including those that were finished before the strike began. Additionally, Boeing received orders for 63 planes, with 40 new orders for 737 Max jets from leasing company Avia Solutions Group. The delay in production has affected airline delivery schedules and has led to frustration among airline customers awaiting new planes from Boeing. The ongoing delays have put pressure on Boeing to resume production at full capacity as soon as possible to meet the demands of their customers and to stabilize their cash flow from new plane deliveries.

In light of the delays in production caused by the strike and the necessary steps needed to resume manufacturing passenger planes, Boeing has faced challenges in meeting airline delivery schedules. The impact of the strike has led to frustration among airline customers who are eagerly awaiting the delivery of new planes. The delays have also pushed back the schedule for gaining certification of new 737 Max models. However, Boeing is working on resolving these issues by prioritizing quality over speed in production. The return of factory workers after the strike will hopefully expedite the process of resuming full production capacity, allowing Boeing to meet the demands of their customers and stabilize their cash flow from delivering new planes.

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
[mc4wp_form]
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
News Room November 13, 2024
Share this Article
Facebook Twitter Copy Link Print
Previous Article University Medical City introduces advanced hearing care in Oman
Next Article QGA getting ready to host the Qatar International Series.
Leave a comment Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected

235.3k Followers Like
69.1k Followers Follow
56.4k Followers Follow
136k Subscribers Subscribe
- Advertisement -
Ad imageAd image

Latest News

Taif Governor Inspects Historic District, Vows Heritage Preservation
Saudi Arabia June 5, 2026
National Committee Reviews Government Policy for Sustainable Endowments and Zakat Funds Wednesday
UAE June 5, 2026
Are Rising Living Costs Changing Life in Gulf Countries?
Are Rising Living Costs Changing Life in Gulf Countries?
Opinion June 4, 2026
Saudi Arabia National Team Fixtures 2026 Match Schedule Results and FIFA World Cup Preparation
Saudi Arabia National Team Fixtures 2026 Match Schedule Results and FIFA World Cup Preparation
Sport June 4, 2026

You Might also Like

Saudi Arabia

Taif Governor Inspects Historic District, Vows Heritage Preservation

June 5, 2026
UAE

National Committee Reviews Government Policy for Sustainable Endowments and Zakat Funds Wednesday

June 5, 2026
Saudi Arabia

Families Swap Late Nights for Discipline Ahead of School Reopening

June 4, 2026
UAE

UAE Weather Tomorrow: Mostly Clear Skies Across the Emirates

June 4, 2026
Bahrain

Works Minister Inspects Sewer Network Progress at Al-Lawzi and Madinat Hamad

June 4, 2026
Kuwait

Pilgrims Tell Al-Anbaa Hajj Was Smooth and Exceptionally Organized

June 4, 2026
Oman

Oman Unveils Geneva Report Documenting Social Protection Redesign

June 4, 2026
Qatar

Iran Accuses Washington of Truce Breach Amid Regional Mediation Talks

June 4, 2026
//

GulfPress is a modern Gulf media platform delivering trusted news, business insights, technology updates, real estate trends, travel stories, explainers, and rankings from across the GCC and the Middle East.

Quick Link

  • About Us
  • Editorial Policy
  • Corrections Policy
  • Advertise with us
  • Contact Us
  • Privacy Policy
  • Terms of use

How Topics

  • Gulf News
  • Business
  • Lifestyle

Sign Up for Our Newsletter

Subscribe to our newsletter to get our latest news instantly!

[mc4wp_form]

Gulf PressGulf Press
Follow US

© 2023 Gulf Press. All Rights Reserved.

Join Us!

Subscribe to our newsletter and never miss our latest news, podcasts etc..

[mc4wp_form]
Zero spam, Unsubscribe at any time.

Removed from reading list

Undo
Welcome Back!

Sign in to your account

Lost your password?